Horizon Wind Energy-WRidge (G79)

Horizon Wind Energy-WRidge is a 200.0 MW wind interconnection project in Asotin, Washington with a current status of withdrawn. It is proposed to connect at 115 kV North Lewiston-Walla Walla line near Clarkston WA.

200.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameHorizon Wind Energy-WRidge
Queue IDG79
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyWind
Capacity200.0 MW
StateWashington
CountyAsotin
Point of interconnection115 kV North Lewiston-Walla Walla line near Clarkston WA
Requested (queue) date2001-09-27
Proposed in-service date2003-06-15
Operational date
Withdrawn date
DeveloperWind Ridge Power Partners, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata