Asotin County, Washington — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Asotin, Washington, representing 1,160 MW of requested capacity.
6Total projects
0Active
0Operational
5Withdrawn
1,160 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar+Battery | 4 | 660 MW |
| Solar | 1 | 300 MW |
| Wind | 1 | 200 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| WA Queue Project G0736 — Solar in Asotin, Washington | G0736 | Solar | 300.0 MW | withdrawn | Asotin, Washington |
| PACW Queue Project C3-029 — Solar+Battery in Asotin, Washington | C3-029 | Solar+Battery | 200.0 MW | withdrawn | Asotin, Washington |
| Horizon Wind Energy-WRidge | G79 | Wind | 200.0 MW | withdrawn | Asotin, Washington |
| PACW Queue Project C2-41 — Solar+Battery in Asotin, Washington | C2-41 | Solar+Battery | 160.0 MW | withdrawn | Asotin, Washington |
| WA Queue Project Q60 — Solar+Battery in Asotin, Washington | Q60 | Solar+Battery | 150.0 MW | withdrawn | Asotin, Washington |
| West Queue Project 60 — Solar+Battery in Asotin, Washington | 60 | Solar+Battery | 150.0 MW | suspended | Asotin, Washington |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Wind Ridge Power Partners, LLC | 1 | 200 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: avista-oasis; bpa-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Asotin County.
Start tracking with interXdata