Horse Hollow Wind Energy Center (56291_2)

Horse Hollow Wind Energy Center is a 223.5 MW wind interconnection project in Taylor, Texas with a current status of operational.

223.5 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameHorse Hollow Wind Energy Center
Queue ID56291_2
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity223.5 MW
StateTexas
CountyTaylor
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2006-06-01
Withdrawn date—
Developer—
Utility / transmission ownerFPL Energy Horse Hollow LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata