Horse Shoe Run 69 kV (D03_W15)

Horse Shoe Run 69 kV is a 12.0 MW gas interconnection project in Preston, West Virginia with a current status of withdrawn.

12.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameHorse Shoe Run 69 kV
Queue IDD03_W15
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity12.0 MW
StateWest Virginia
CountyPreston
Point of interconnection
Requested (queue) date2000-04-24
Proposed in-service date2003-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata