Horsepower BESS (28INR0390)
Horsepower BESS is a 257.5 MW other interconnection project in Bexar, Texas with a current status of operational. It is proposed to connect at POI is 138 kV Howard Substation (Bus# 5230) (SSWG bus name: HOWARD), NMMS station code: S1.
257.5 MWCapacity
OperationalStatus
BexarMarket
OtherTechnology
Project facts
| Canonical name | Horsepower BESS |
|---|---|
| Queue ID | 28INR0390 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Bexar |
| Technology | Other |
| Capacity | 257.5 MW |
| State | Texas |
| County | Bexar |
| Point of interconnection | POI is 138 kV Howard Substation (Bus# 5230) (SSWG bus name: HOWARD), NMMS station code: S1 |
| Requested (queue) date | 2025-12-17 |
| Proposed in-service date | — |
| Operational date | 2028-01-31 |
| Withdrawn date | — |
| Developer | Horsepower BESS, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata