Horseshoe Lake 138kV Substation (GEN-2025-SR22)

Horseshoe Lake 138kV Substation is a 100.0 MW other interconnection project in Harrah, Oklahoma with a current status of active. It is proposed to connect at Horseshoe Lake 138kV Substation.

100.0 MWCapacity
ActiveStatus
OKMarket
OtherTechnology

Project facts

Canonical nameHorseshoe Lake 138kV Substation
Queue IDGEN-2025-SR22
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketOK
TechnologyOther
Capacity100.0 MW
StateOklahoma
CountyHarrah
Point of interconnectionHorseshoe Lake 138kV Substation
Requested (queue) date2025-06-12
Proposed in-service date2030-11-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerOG&E

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata