Hovey Solar 2 (26INR0736)
Hovey Solar 2 is a 8.1 MW solar interconnection project in Pecos, Texas with a current status of active. It is proposed to connect at 60385 Solstice 138 kV.
8.1 MWCapacity
ActiveStatus
PecosMarket
SolarTechnology
Project facts
| Canonical name | Hovey Solar 2 |
|---|---|
| Queue ID | 26INR0736 |
| Status | active |
| Source status | — |
| Market | Pecos |
| Technology | Solar |
| Capacity | 8.1 MW |
| State | Texas |
| County | Pecos |
| Point of interconnection | 60385 Solstice 138 kV |
| Requested (queue) date | — |
| Proposed in-service date | 2026-07-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Barilla Solar, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata