Howard-Fostoria Central 138kV (V1-010)

Howard-Fostoria Central 138kV is a 260.0 MW wind interconnection project in Crawford, Ohio with a current status of withdrawn.

260.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameHoward-Fostoria Central 138kV
Queue IDV1-010
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity260.0 MW
StateOhio
CountyCrawford
Point of interconnection
Requested (queue) date2009-02-25
Proposed in-service date2013-12-01
Operational date
Withdrawn date2012-04-19
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.