Howard-Melmore 138 kV is a 58.0 MW solar interconnection project in Crawford, Ohio with a current status of withdrawn.

58.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameHoward-Melmore 138 kV
Queue IDAG1-358
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity58.0 MW
StateOhio
CountyCrawford
Point of interconnection—
Requested (queue) date2020-09-30
Proposed in-service date2023-12-31
Operational date—
Withdrawn date2021-11-08
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.