Hubbard - Badoura 230kV Line (J935)

Hubbard - Badoura 230kV Line is a 200.0 MW solar interconnection project in Hubbard County, Minnesota with a current status of withdrawn. It is proposed to connect at Hubbard - Badoura 230kV Line.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHubbard - Badoura 230kV Line
Queue IDJ935
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateMinnesota
CountyHubbard County
Point of interconnectionHubbard - Badoura 230kV Line
Requested (queue) date2017-06-16
Proposed in-service date2020-09-15
Operational date2020-09-15
Withdrawn date2019-02-04
Developer
Utility / transmission ownerMINNESOTA POWER INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.