Hubbardston - Tech Drive 138kV (J1589)

Hubbardston - Tech Drive 138kV is a 150.0 MW solar interconnection project in Clinton, Michigan with a current status of withdrawn. It is proposed to connect at Hubbardston - Tech Drive 138kV.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHubbardston - Tech Drive 138kV
Queue IDJ1589
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateMichigan
CountyClinton
Point of interconnectionHubbardston - Tech Drive 138kV
Requested (queue) date2020-06-23
Proposed in-service date2022-12-15
Operational date2022-12-15
Withdrawn date2022-01-04
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.