Clinton County, Michigan — Interconnection Projects

The interXdata warehouse tracks 13 interconnection projects in Clinton, Michigan, representing 1,167 MW of requested capacity.

13Total projects
0Active
7Operational
6Withdrawn
1,167 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar6770 MW
Wind2349 MW
Battery145 MW
Gas43 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
GREENWOOD - RAPSON 345.0kVJ4195Wind300.0 MWoperationalClinton, Michigan
Bingham to Marquette 138 kVJ2674Solar200.0 MWwithdrawnClinton, Michigan
Bingham - Lookng GL J 138kVJ3203Solar150.0 MWwithdrawnClinton, Michigan
BINGHAMJ1553Solar150.0 MWoperationalClinton, Michigan
Hubbardston - Tech Drive 138kVJ1589Solar150.0 MWwithdrawnClinton, Michigan
Mulliken Jct.- Chester 69 kVJ2710Solar100.0 MWwithdrawnClinton, Michigan
MISO Queue Project J070 — Wind in Clinton, MichiganJ070Wind49.2 MWwithdrawnClinton, Michigan
Bingham West 138kVJ1862Battery45.0 MWwithdrawnClinton, Michigan
Bingham Solar, LLC63321_BINGHSolar20.0 MWoperationalClinton, Michigan
Grand River10532_2-4Gas0.8 MWoperationalClinton, Michigan
Grand River10532_2-1Gas0.8 MWoperationalClinton, Michigan
Grand River10532_2-3Gas0.8 MWoperationalClinton, Michigan
Grand River10532_2-5Gas0.8 MWoperationalClinton, Michigan

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Clinton County.

Start tracking with interXdata