Hull 138kV (J3506)

Hull 138kV is a 100.0 MW battery interconnection project in Pike, Illinois with a current status of withdrawn. It is proposed to connect at Hull 138kV.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameHull 138kV
Queue IDJ3506
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateIllinois
CountyPike
Point of interconnectionHull 138kV
Requested (queue) date2024-04-15
Proposed in-service date2028-06-30
Operational date2028-06-30
Withdrawn date2024-08-13
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata