Huntley 345kV (J2420)

Huntley 345kV is a 95.0 MW solar interconnection project in Faribault, Minnesota with a current status of withdrawn. It is proposed to connect at Huntley 345kV.

95.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHuntley 345kV
Queue IDJ2420
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity95.0 MW
StateMinnesota
CountyFaribault
Point of interconnectionHuntley 345kV
Requested (queue) date2022-09-12
Proposed in-service date2027-10-01
Operational date2027-10-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata