Huntley (0219)

Huntley is a 752.0 MW gas interconnection project in Niagara, New York with a current status of withdrawn. It is proposed to connect at Tonawanda.

752.0 MWCapacity
WithdrawnStatus
AMarket
GasTechnology

Project facts

Canonical nameHuntley
Queue ID0219
Statuswithdrawn
Source status0
MarketA
TechnologyGas
Capacity752.0 MW
StateNew York
CountyNiagara
Point of interconnectionTonawanda
Requested (queue) date2006-07-12
Proposed in-service date2008-12-22
Operational date
Withdrawn date
DeveloperNRG Energy, Inc.
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata