Husky Solar (1138)

Husky Solar is a 50.2 MW solar interconnection project in Windham, Connecticut with a current status of active. It is proposed to connect at The POI will be located about 6.9 miles from the 1607/1505 line ROW (Exeter Tap) and about 1.1 miles from the Exeter Sub 54N along the 115 kV underground line to the Exeter Sub 54N..

50.2 MWCapacity
ActiveStatus
CTMarket
SolarTechnology

Project facts

Canonical nameHusky Solar
Queue ID1138
Statusactive
Source statusA
MarketCT
TechnologySolar
Capacity50.2 MW
StateConnecticut
CountyWindham
Point of interconnectionThe POI will be located about 6.9 miles from the 1607/1505 line ROW (Exeter Tap) and about 1.1 miles from the Exeter Sub 54N along the 115 kV underground line to the Exeter Sub 54N.
Requested (queue) date2021-06-03
Proposed in-service date2030-05-10
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata