Hutsonville - Neoga 138KV (J2159)

Hutsonville - Neoga 138KV is a 50.0 MW battery interconnection project in Clark, Illinois with a current status of operational. It is proposed to connect at Hutsonville - Neoga 138KV.

50.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameHutsonville - Neoga 138KV
Queue IDJ2159
Statusoperational
Source statusPending Transfer
Market
TechnologyBattery
Capacity50.0 MW
StateIllinois
CountyClark
Point of interconnectionHutsonville - Neoga 138KV
Requested (queue) date2021-08-24
Proposed in-service date2024-08-31
Operational date2024-08-31
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.