HUTTIG SS - STRONG SS 115.0kV (S1170)

HUTTIG SS - STRONG SS 115.0kV is a 100.0 MW battery interconnection project in Union, Arkansas with a current status of operational. It is proposed to connect at HUTTIG SS - STRONG SS 115.0kV.

100.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameHUTTIG SS - STRONG SS 115.0kV
Queue IDS1170
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity100.0 MW
StateArkansas
CountyUnion
Point of interconnectionHUTTIG SS - STRONG SS 115.0kV
Requested (queue) date2025-06-27
Proposed in-service date2028-03-01
Operational date2028-03-01
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-17new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.