HVDC from S. Maine to Mystic - bidirectional flow is a 1,000.0 MW generation interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at CMP 345 kV ME Yankee substation to NSTAR 345 kV Mystic substation.

1,000.0 MWCapacity
WithdrawnStatus
BOSTMarket
GenerationTechnology

Project facts

Canonical nameHVDC from S. Maine to Mystic - bidirectional flow
Queue ID517
Statuswithdrawn
Source statusW
MarketBOST
TechnologyGeneration
Capacity1,000.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionCMP 345 kV ME Yankee substation to NSTAR 345 kV Mystic substation
Requested (queue) date2015-02-16
Proposed in-service date2018-12-31
Operational date
Withdrawn date2015-07-09
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata