HVDC Tie NB to Mystic is a 900.0 MW generation interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at NB 345 kV Coleson Cove substation to NSTAR 345 kV Mystic substation.

900.0 MWCapacity
WithdrawnStatus
BOSTMarket
GenerationTechnology

Project facts

Canonical nameHVDC Tie NB to Mystic
Queue ID585
Statuswithdrawn
Source statusW
MarketBOST
TechnologyGeneration
Capacity900.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionNB 345 kV Coleson Cove substation to NSTAR 345 kV Mystic substation
Requested (queue) date2015-12-14
Proposed in-service date2020-12-30
Operational date
Withdrawn date2018-03-05
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.