IEP Blackhawk (25INR0310)

IEP Blackhawk is a 100.0 MW other interconnection project in Galveston, Texas with a current status of operational. It is proposed to connect at 38740 Heights Substation 138kV .

100.0 MWCapacity
OperationalStatus
GalvestonMarket
OtherTechnology

Project facts

Canonical nameIEP Blackhawk
Queue ID25INR0310
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGalveston
TechnologyOther
Capacity100.0 MW
StateTexas
CountyGalveston
Point of interconnection38740 Heights Substation 138kV
Requested (queue) date2023-04-07
Proposed in-service date
Operational date2026-12-01
Withdrawn date
DeveloperIEP Texas Verde II, llc
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata