IEP Orchard BESS is a 10.0 MW other interconnection project in Fort Bend, Texas with a current status of active. It is proposed to connect at Station Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: 44541 Voltage in kV (Transmission Level): 138 kV Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System. .
Project facts
| Canonical name | IEP Orchard BESS |
|---|---|
| Queue ID | 23INR0556 |
| Status | active |
| Source status | — |
| Market | Fort Bend |
| Technology | Other |
| Capacity | 10.0 MW |
| State | Texas |
| County | Fort Bend |
| Point of interconnection | Station Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: 44541 Voltage in kV (Transmission Level): 138 kV Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System. |
| Requested (queue) date | — |
| Proposed in-service date | 2026-09-18 |
| Operational date | — |
| Withdrawn date | — |
| Developer | IEP Tejas Verde LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata