IEP Orchard BESS (23INR0556)

IEP Orchard BESS is a 10.0 MW other interconnection project in Fort Bend, Texas with a current status of active. It is proposed to connect at Station Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: 44541 Voltage in kV (Transmission Level): 138 kV Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System. .

10.0 MWCapacity
ActiveStatus
Fort BendMarket
OtherTechnology

Project facts

Canonical nameIEP Orchard BESS
Queue ID23INR0556
Statusactive
Source status
MarketFort Bend
TechnologyOther
Capacity10.0 MW
StateTexas
CountyFort Bend
Point of interconnectionStation Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: 44541 Voltage in kV (Transmission Level): 138 kV Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System.
Requested (queue) date
Proposed in-service date2026-09-18
Operational date
Withdrawn date
DeveloperIEP Tejas Verde LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata