IGS AKC1 (65985_461)

IGS AKC1 is a 3.8 MW solar interconnection project in Summit, Ohio with a current status of operational.

3.8 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameIGS AKC1
Queue ID65985_461
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity3.8 MW
StateOhio
CountySummit
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-07-01
Withdrawn date—
Developer—
Utility / transmission ownerAltus Power America Management, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.