IL University Park 450 Central Ave is a 2.3 MW solar interconnection project in Will, Illinois with a current status of operational.

2.3 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameIL University Park 450 Central Ave
Queue ID68538_20424
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity2.3 MW
StateIllinois
CountyWill
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-10-01
Withdrawn date
Developer
Utility / transmission ownerCatalyze University Park Central Ave Microgrid, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata