Increase Existing Capacity (183)

Increase Existing Capacity is a 70.0 MW other interconnection project in New London, Connecticut with a current status of operational. It is proposed to connect at CL&P Millstone 345 kV Substation.

70.0 MWCapacity
OperationalStatus
CTMarket
OtherTechnology

Project facts

Canonical nameIncrease Existing Capacity
Queue ID183
Statusoperational
Source statusC
MarketCT
TechnologyOther
Capacity70.0 MW
StateConnecticut
CountyNew London
Point of interconnectionCL&P Millstone 345 kV Substation
Requested (queue) date2006-11-17
Proposed in-service date
Operational date2008-11-01
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.