Increase to biomass project in queue position 218 (223)
Increase to biomass project in queue position 218 is a 20.5 MW other interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at Doreen 115 kV substation or F132 115 kV line.
20.5 MWCapacity
WithdrawnStatus
WMAMarket
OtherTechnology
Project facts
| Canonical name | Increase to biomass project in queue position 218 |
|---|---|
| Queue ID | 223 |
| Status | withdrawn |
| Source status | W |
| Market | WMA |
| Technology | Other |
| Capacity | 20.5 MW |
| State | Massachusetts |
| County | Berkshire |
| Point of interconnection | Doreen 115 kV substation or F132 115 kV line |
| Requested (queue) date | 2007-07-25 |
| Proposed in-service date | 2010-12-01 |
| Operational date | — |
| Withdrawn date | 2009-01-30 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata