Increase to Pumping load (1191)

Increase to Pumping load is a 333.0 MW other interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at The current Bear Swamp interconnection points.

333.0 MWCapacity
WithdrawnStatus
WMAMarket
OtherTechnology

Project facts

Canonical nameIncrease to Pumping load
Queue ID1191
Statuswithdrawn
Source statusW
MarketWMA
TechnologyOther
Capacity333.0 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionThe current Bear Swamp interconnection points
Requested (queue) date2021-11-03
Proposed in-service date2021-11-03
Operational date
Withdrawn date2021-11-09
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata