Independent - Holland Bottom 500kV (J2841)

Independent - Holland Bottom 500kV is a 500.0 MW wind interconnection project in Independence, Arkansas with a current status of operational. It is proposed to connect at Independent - Holland Bottom 500kV.

500.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameIndependent - Holland Bottom 500kV
Queue IDJ2841
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity500.0 MW
StateArkansas
CountyIndependence
Point of interconnectionIndependent - Holland Bottom 500kV
Requested (queue) date2022-09-15
Proposed in-service date2025-10-01
Operational date2025-10-01
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata