Indian River 230 kV II (AG2-347 - moved to TC2)
Indian River 230 kV II is a 448.8 MW wind interconnection project in Sussex, Delaware with a current status of withdrawn.
448.8 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | Indian River 230 kV II |
|---|---|
| Queue ID | AG2-347 - moved to TC2 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Wind |
| Capacity | 448.8 MW |
| State | Delaware |
| County | Sussex |
| Point of interconnection | — |
| Requested (queue) date | 2021-03-26 |
| Proposed in-service date | 2030-12-31 |
| Operational date | — |
| Withdrawn date | 2025-11-21 |
| Developer | — |
| Utility / transmission owner | DPL |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata