Indian River 230 kV is a 150.0 MW battery interconnection project in Sussex, Delaware with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameIndian River 230 kV
Queue IDAH2-077
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity150.0 MW
StateDelaware
CountySussex
Point of interconnection
Requested (queue) date2022-01-27
Proposed in-service date2027-06-01
Operational date
Withdrawn date2026-02-12
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.