Indigo solar 2 (25INR0547)

Indigo solar 2 is a 180.0 MW solar interconnection project in Fisher, Texas with a current status of operational. It is proposed to connect at Tap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2.

180.0 MWCapacity
OperationalStatus
FisherMarket
SolarTechnology

Project facts

Canonical nameIndigo solar 2
Queue ID25INR0547
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFisher
TechnologySolar
Capacity180.0 MW
StateTexas
CountyFisher
Point of interconnectionTap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2
Requested (queue) date2023-10-04
Proposed in-service date
Operational date2027-07-15
Withdrawn date
DeveloperIndigo Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata