Indigo Storage 3 (25INR0529)

Indigo Storage 3 is a 60.0 MW other interconnection project in Fisher, Texas with a current status of operational. It is proposed to connect at tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2.

60.0 MWCapacity
OperationalStatus
FisherMarket
OtherTechnology

Project facts

Canonical nameIndigo Storage 3
Queue ID25INR0529
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFisher
TechnologyOther
Capacity60.0 MW
StateTexas
CountyFisher
Point of interconnectiontap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2
Requested (queue) date2023-11-14
Proposed in-service date
Operational date2027-09-17
Withdrawn date
DeveloperInnovative Solar 245, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata