Industrial Load (L0389)

Industrial Load is a 450.0 MW other interconnection project in Morrow, Oregon with a current status of operational. It is proposed to connect at Mcnary Substation or Morrow Flat Substation.

450.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology

Project facts

Canonical nameIndustrial Load
Queue IDL0389
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyOther
Capacity450.0 MW
StateOregon
CountyMorrow
Point of interconnectionMcnary Substation or Morrow Flat Substation
Requested (queue) date2015-09-21
Proposed in-service date
Operational date2019-01-01
Withdrawn date
DeveloperUmatilla Electric Cooperative
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata