Industrial Load Phase 2 (L0396)

Industrial Load Phase 2 is a 1,152.0 MW other interconnection project in Morrow, Oregon with a current status of withdrawn. It is proposed to connect at BPA McNary and/or BPA Morrow Flat.

1,152.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameIndustrial Load Phase 2
Queue IDL0396
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity1,152.0 MW
StateOregon
CountyMorrow
Point of interconnectionBPA McNary and/or BPA Morrow Flat
Requested (queue) date2016-02-03
Proposed in-service date2018-01-01
Operational date
Withdrawn date
DeveloperUmatilla Electric Cooperative
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata