Industrial Park (7934_7)

Industrial Park is a 1.8 MW other interconnection project in Whiteside, Illinois with a current status of operational.

1.8 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameIndustrial Park
Queue ID7934_7
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyOther
Capacity1.8 MW
StateIllinois
CountyWhiteside
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2002-06-01
Withdrawn date—
Developer—
Utility / transmission ownerCity of Rock Falls - (IL)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata