Inez 138 kV (AF1-162)

Inez 138 kV is a 100.0 MW battery interconnection project in Martin, Kentucky with a current status of active.

100.0 MWCapacity
ActiveStatus
—Market
BatteryTechnology

Project facts

Canonical nameInez 138 kV
Queue IDAF1-162
Statusactive
Source statusEngineering and Procurement
Market—
TechnologyBattery
Capacity100.0 MW
StateKentucky
CountyMartin
Point of interconnection—
Requested (queue) date2019-09-20
Proposed in-service date2028-05-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata