Intercession City (8049_P4)

Intercession City is a 56.7 MW other interconnection project in Osceola, Florida with a current status of operational.

56.7 MWCapacity
OperationalStatus
FPCMarket
OtherTechnology

Project facts

Canonical nameIntercession City
Queue ID8049_P4
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologyOther
Capacity56.7 MW
StateFlorida
CountyOsceola
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1974-05-01
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata