Internal HVDC - North to South flow (506)
Internal HVDC - North to South flow is a 1,000.0 MW generation interconnection project in Suffolk, Massachusetts with a current status of withdrawn. It is proposed to connect at NMISA to NSTAR 345 kV K Street substation.
1,000.0 MWCapacity
WithdrawnStatus
BOSTMarket
GenerationTechnology
Project facts
| Canonical name | Internal HVDC - North to South flow |
|---|---|
| Queue ID | 506 |
| Status | withdrawn |
| Source status | W |
| Market | BOST |
| Technology | Generation |
| Capacity | 1,000.0 MW |
| State | Massachusetts |
| County | Suffolk |
| Point of interconnection | NMISA to NSTAR 345 kV K Street substation |
| Requested (queue) date | 2015-02-16 |
| Proposed in-service date | 2027-10-01 |
| Operational date | — |
| Withdrawn date | 2020-02-10 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata