INTREPID ENERGY is a 1,500.1 MW wind interconnection project in Humboldt, California with a current status of withdrawn. It is proposed to connect at Round Mountain Substation 500kV.

1,500.1 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameINTREPID ENERGY
Queue ID1692
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity1,500.1 MW
StateCalifornia
CountyHumboldt
Point of interconnectionRound Mountain Substation 500kV
Requested (queue) date2020-04-15
Proposed in-service date
Operational date
Withdrawn date2021-04-09
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata