Invenergy Wind Development (G120)
Invenergy Wind Development is a 180.0 MW wind interconnection project in Morrow, Oregon with a current status of withdrawn. It is proposed to connect at McNary – Santiam 230 kV transmission line.
180.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology
Project facts
| Canonical name | Invenergy Wind Development |
|---|---|
| Queue ID | G120 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Wind |
| Capacity | 180.0 MW |
| State | Oregon |
| County | Morrow |
| Point of interconnection | McNary – Santiam 230 kV transmission line |
| Requested (queue) date | 2003-11-24 |
| Proposed in-service date | 2005-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Invenergy |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata