Ipava-Macomb, West-1429 138 kV is a 100.8 MW solar interconnection project in Fulton, Illinois with a current status of withdrawn. It is proposed to connect at Ipava-Macomb, West-1429 138 kV.

100.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameIpava-Macomb, West-1429 138 kV
Queue IDJ2702
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.8 MW
StateIllinois
CountyFulton
Point of interconnectionIpava-Macomb, West-1429 138 kV
Requested (queue) date2022-09-14
Proposed in-service date2027-04-15
Operational date2027-04-15
Withdrawn date2025-10-27
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata