ISLAND ENERGY CENTER (373)

ISLAND ENERGY CENTER is a 315.0 MW gas interconnection project in San Joaquin, California with a current status of withdrawn. It is proposed to connect at Loop Tesla Stagg and Tesla-Eight Mile 230 kV lines.

315.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameISLAND ENERGY CENTER
Queue ID373
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity315.0 MW
StateCalifornia
CountySan Joaquin
Point of interconnectionLoop Tesla Stagg and Tesla-Eight Mile 230 kV lines
Requested (queue) date2008-05-27
Proposed in-service date
Operational date
Withdrawn date2008-11-26
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.