ITC Hugo 7 345 kV Substation (GEN-2024-323)

ITC Hugo 7 345 kV Substation is a 356.8 MW gas interconnection project in Choctaw, Oklahoma with a current status of operational. It is proposed to connect at ITC Hugo 7 345 kV Substation.

356.8 MWCapacity
OperationalStatus
OKMarket
GasTechnology

Project facts

Canonical nameITC Hugo 7 345 kV Substation
Queue IDGEN-2024-323
Statusoperational
Source statusDISIS STAGE
MarketOK
TechnologyGas
Capacity356.8 MW
StateOklahoma
CountyChoctaw
Point of interconnectionITC Hugo 7 345 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2029-01-02
Withdrawn date
Developer
Utility / transmission ownerITCGP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata