J D Kennedy (666_GT37)

J D Kennedy is a 185.0 MW gas interconnection project in Duval, Florida with a current status of operational.

185.0 MWCapacity
OperationalStatus
JEAMarket
GasTechnology

Project facts

Canonical nameJ D Kennedy
Queue ID666_GT37
Statusoperational
Source status(OP) Operating
MarketJEA
TechnologyGas
Capacity185.0 MW
StateFlorida
CountyDuval
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2000-06-01
Withdrawn date
Developer
Utility / transmission ownerJEA

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata