Jack County 2 (10INR0010)

Jack County 2 is a 565.0 MW gas interconnection project with a current status of operational. It is proposed to connect at JCKCNTY2_CT318.000.

565.0 MWCapacity
OperationalStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameJack County 2
Queue ID10INR0010
Statusoperational
Source statusoperational
MarketERCOT
TechnologyGas
Capacity565.0 MW
State
County
Point of interconnectionJCKCNTY2_CT318.000
Requested (queue) date2006-12-05
Proposed in-service date2011-06-01
Operational date
Withdrawn date
DeveloperBrazos Electric Cooperative
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata