Jack McDonough (710_4)

Jack McDonough is a 369.0 MW gas interconnection project in Cobb, Georgia with a current status of operational.

369.0 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameJack McDonough
Queue ID710_4
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity369.0 MW
StateGeorgia
CountyCobb
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2011-12-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata