Jack McDonough (710_CT4A)

Jack McDonough is a 276.3 MW gas interconnection project in Cobb, Georgia with a current status of operational.

276.3 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameJack McDonough
Queue ID710_CT4A
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity276.3 MW
StateGeorgia
CountyCobb
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2011-12-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.