Jackalope Solar (23INR0180)

Jackalope Solar is a 155.7 MW solar interconnection project in San Patricio, Texas with a current status of operational. It is proposed to connect at 8173 Gibbs 138kV.

155.7 MWCapacity
OperationalStatus
San PatricioMarket
SolarTechnology

Project facts

Canonical nameJackalope Solar
Queue ID23INR0180
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketSan Patricio
TechnologySolar
Capacity155.7 MW
StateTexas
CountySan Patricio
Point of interconnection8173 Gibbs 138kV
Requested (queue) date2021-02-09
Proposed in-service date
Operational date2026-02-05
Withdrawn date
DeveloperPeacock Energy Project, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata