Jackson Township (08JCKSN_TWNS) - Heritage Lake (08HERITL) (J3143)

Jackson Township (08JCKSN_TWNS) - Heritage Lake (08HERITL) is a 50.0 MW solar interconnection project in Putnam, Indiana with a current status of withdrawn. It is proposed to connect at Jackson Township (08JCKSN_TWNS) - Heritage Lake (08HERITL).

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameJackson Township (08JCKSN_TWNS) - Heritage Lake (08HERITL)
Queue IDJ3143
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StateIndiana
CountyPutnam
Point of interconnectionJackson Township (08JCKSN_TWNS) - Heritage Lake (08HERITL)
Requested (queue) date2022-09-13
Proposed in-service date2027-07-01
Operational date2027-07-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata