Jacksonville Industrial Pk-Winchester Switching Station 138 kV (J3174)

Jacksonville Industrial Pk-Winchester Switching Station 138 kV is a 180.0 MW solar interconnection project in Scott, Illinois with a current status of withdrawn. It is proposed to connect at Jacksonville Industrial Pk-Winchester Switching Station 138 kV.

180.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameJacksonville Industrial Pk-Winchester Switching Station 138 kV
Queue IDJ3174
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity180.0 MW
StateIllinois
CountyScott
Point of interconnectionJacksonville Industrial Pk-Winchester Switching Station 138 kV
Requested (queue) date2022-09-09
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date2025-10-27
Developer
Utility / transmission ownerPRAIRIE POWER, INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata